Thursday, March 22, 2018

Continuing on with some tasks

On the roof, we wanted to drill holes to hold the frames closed with clevis pins...
We were looking for pins that would hold the frame closed and one of the Home Depot employees showed us these clevis pins that seemed that they would do the job.

We were holding the frame closed with bolts, but thought that would be difficult to deal with on a regular basis...

So Dwayne and I went up to drill a hole through the two pieces of uni-strut to insert the clevis pins. We got those all completed on Tuesday.

We had been trying to figure out how to provide adequate ventilation for the solar controller if we installed it in the bay with the inverter/charger... after lots of discussion, we decided it would be better to install it inside the rig. We had it on the floor and Tabitha was checking it out...

... she did a complete "cat scan" on it!