Sunday, March 18, 2018

Lots of progress on Saturday!!!

We got a lot done on Saturday!!!
Preparing the bay for new inverter and solar controller - we needed to run a wire from the solar panels on the roof down into this area.

All the panels are on the roof!

Six of  'em!

Lining them up...

Do they look straight to you?

3 of the 6 are on hinged supports so we can get to the storage pods and spare tire.

We are very pleased with how the hinging has come together!

Michael working on the wiring...

He decided to use the spare tire as a cushion while running some of the wires!

I think it looks a bit more comfortable than it really was!

We had run out of daylight, but Dwayne was doing some additional securing of the panels.

Michael was putting together some electrical conduit for running the wiring on the roof before it heads down through a vent panel and down the inside wall of the bus into the lower storage compartment.
It was a BUSY day and we were all pooped!